This weekend was a long one. Mostly doing plumbing of the custom sink fixtures my wife picked out. If you don't use Wayne Homes' standard fixtures or upgrade through them, then you are responsible to get yours installed. The drains in the kitchen were a real pain given the location of the drain stub from the wall being too close to where the sink drain comes down. But perserverence won the day. All faucets and drains are now installed and functioning. I also got our exterior lights installed so no more wires hanging out my wall.
Had an issue with drywall since we did the custom round corners. I worked directly with the contractor on those and there were some very noticable defects that he would not fix so I've been mudding and sanding to correct. Nothing against Wayne Homes on that. That is between me and contractor. My FM did try to get the contractor to address it which I appreciated. The guy that came by covered maybe a tenth of what was clearly visible. Apparently even half-a**ed was too much to ask for. Got the worst of it done now so we can touch up paint and we will be in good shape. Everything else the drywallers did was very good and ceiling came out beautiful so all in all, those guys still get a passing grade.
Our carpet is in!!! Looks great. Aside from some seeming I'm not thrilled about in 1 room, they did a great job and we are quite pleased.
Sorry no pictures of all this stuff. Too long a weekend. I'll get pics added this week...
No comments:
Post a Comment