Our excavator was taking advantage of some rare dry weather this Saturday and came out while we were working in the house on the new arches. He was able to dig the pit for our septic tank and trench from the water hookup to the house. This weekend was miserably hot. I mean miserably!

 Trench for Water Line. Sewer line is already buried on the other side of the electric meter.

 Digging pit for septic tank.

 Pit ready to go. Just need to get tanked.
 And here it is. All 1500 gallons capacity of it.

 Bigger and deeper than it looks from the photo.

 So stinking hot we tried out as a swimming pool first.